Tracked drilling rigs ZIV URB-4T, URB-2NT, etc.

The URB-2A2 drilling rig is designed mainly for drilling geophysical and structural exploration wells for oil and gas, exploration of deposits of solid minerals, construction materials and groundwater, engineering and geological surveys, drilling of water intake and blast wells. This drilling rig with a movable rotator, designed for rotary drilling with flushing or purging of the well, or augers.
The drilling rig URB-2D3 is designed for rotary drilling with flushing, purging, shock-rotational method with a submersible pneumatic hammer and augers of wells for various purposes, including water intake.
The URB-4T drilling rig is designed for drilling geophysical and structural exploration wells for oil and gas, exploration of deposits of solid minerals, construction materials and groundwater, engineering and geological surveys, as well as drilling water intake and blast wells. Drilling is carried out in a rotational way with flushing or purging of the well or augers.
The URB-2NT drilling rig is designed for vertical and inclined drilling of geophysical, structural-prospecting mapping and exploration wells for oil and gas in a rotational manner, with flushing, face blowing or augers, in areas accessible to tracked vehicles.All the mechanisms included in the exploration drilling rig are mounted on their own frame attached to the frame of the skidder tractor and are powered by its engine.
The drilling rig URB-1B2 is designed for drilling wells with augers for various purposes in off-road conditions. The installation is mounted on the chassis of the GAZ-34037 crawler conveyor (a new modification of the GAZ-71).
DOCUMENTATION
All ZIV products
About ZIV
-
SAFETY STANDARDS
The plant has developed technical specifications, drawings and operational documentation for the entire product range in accordance with the requirements of state standards in the field of industrial safety. -
QUALITY CONTROL
Before the start of mass production, drilling rigs undergo acceptance tests. The acceptance of the product is carried out by an interdepartmental commission, which makes a decision on mass production and coordinates the technical conditions for the drilling rig. -
FULL CONTROL
Nonconformities of products are documented by the technical control department with the registration of an analysis report, where the causes are studied and actions are developed aimed at eliminating the causes of nonconformity.
NEW TECHNOLOGIES GROUP
Contact us or your local dealer for more information on certifications, features, reviews, pricing, stock availability and delivery terms for ZIV products.
Reply guaranteed within 8 business hours
- (727)345-47-04
- (3955)60-70-56
- (8182)63-90-72
- (8512)99-46-04
- (3852)73-04-60
- (4722)40-23-64
- (4162)22-76-07
- (4832)59-03-52
- (8352)28-53-07
- (351)202-03-61
- (8202)49-02-64
- (3022)38-34-83
- (395)279-98-46
- (4932)77-34-06
- (3412)26-03-58
- (4012)72-03-81
- (4842)92-23-67
- (843)206-01-48
- (3842)65-04-62
- (4212)92-98-04
- (8332)68-02-04
- (4966)23-41-49
- (4942)77-07-48
- (861)203-40-90
- (391)204-63-61
- (3522)50-90-47
- (4712)77-13-04
- (4742)52-20-81
- (3519)55-03-13
- (375)257-127-884
- (495)268-04-70
- (8152)59-64-93
- (8552)20-53-41
- (831)429-08-12
- (3843)20-46-81
- (383)227-86-73
- (3496)41-32-12
- (3812)21-46-40
- (4862)44-53-42
- (3532)37-68-04
- (8412)22-31-16
- (342)205-81-47
- (8142)55-98-37
- (8112)59-10-37
- (863)308-18-15
- (4912)46-61-64
- (812)309-46-40
- (846)206-03-16
- (8342)22-96-24
- (845)249-38-78
- (8692)22-31-93
- (3652)67-13-56
- (4812)29-41-54
- (862)225-72-31
- (8652)20-65-13
- (3462)77-98-35
- (8212)25-95-17
- (4752)50-40-97
- (998)71-205-18-59
- (8482)63-91-07
- (3822)98-41-53
- (4872)33-79-87
- (4822)63-31-35
- (3452)66-21-18
- (347)229-48-12
- (3012)59-97-51
- (8422)24-23-59
- (8672)28-90-48
- (4922)49-43-18
- (423)249-28-31
- (844)278-03-48
- (8172)26-41-59
- (473)204-51-73
- (4112)23-90-97
- (4852)69-52-93
- (343)384-55-89